ENGIE is at the forefront of the energy transition, committed to producing clean and sustainable energy. Through our wind farms, we contribute significantly to reducing greenhouse gas emissions and promoting a greener, more sustainable future.
Our wind farms, located in the Highlands of Fafe, Nave, Mourisca, Serra do Ralo, and Prados, are examples of innovation and efficiency in renewable energy production. Each of these farms was strategically developed to maximize the wind potential of their regions, with the best possible location and minimal impact, thus ensuring efficient and clean energy production.
Fafe Highlands Wind Farm
Coordinates: 41°30’29.46″N / 8°5’29.69″W Installed Capacity: 128.5 MW Number of Wind Turbines: 53 GAMESA G87 + 5 Vestas V150
Average annual production is approximately equivalent to the electricity consumption of Fafe, Celorico de Basto, and Cabeceiras de Basto.
Nave Wind Farm
Coordinates: 40°56’03.55″N / 7°46’51.73″W Installed Capacity: 47 MW Number of Wind Turbines: 19 Gamesa G87 + 2 Vestas 150
Average annual production is approximately equivalent to the electricity consumption of Vila Nova de Paiva, Castro Daire, and Moimenta da Beira.
Mourisca Wind Farm
Coordinates: 40°56’04.45″N / 7°46’53.44″W Installed Capacity: 47 MW Number of Wind Turbines: 19 Gamesa G90 + 2 Vestas V150
The average annual production represents approximately the electricity consumption of Castro Daire and São Pedro do Sul.
Serra do Ralo Wind Farm
Coordinates: 40°35’39.45″N / 7°23’26.02″W Installed Capacity: 41 MW Number of Wind Turbines: 16 Gamesa G87, + 2 Vestas V150
Average annual production roughly represents the electricity consumption of Celorico da Beira, Trancoso, Fornos de Algodres, and Gouveia.
Prados-Lomba Wind Farm
Coordinates: 40°32’48.58″N / 7°22’3.19″W Installed Capacity: 39.1 MW Number of Wind Turbines: 17 Enercon E-92, 2.35 MW = 39.95 MW