Energy for the future

Wind Onshore & Flex Generation

Wind Onshore

ENGIE now holds 100% of the assets corresponding to the wind farms of Fafe, Mourisca, Nave, Ralo, and Lomba. The total installed capacity of these five wind farms is 303MW.
The integration of this portfolio, currently in certification process, emerged during the strategic split of TrustEnergy, announced in August 2024, and represented an important step in ENGIE’s growth and national consolidation as a world-leading brand in the Net Zero Carbon energy transition.
TrustEnergy was a joint venture between ENGIE (50%) and Marubeni (50%), with a strong presence in the energy sector in Portugal. The split was designed to boost focus and accelerate growth for both shareholders. With this split, both companies sought to concentrate on their core competencies, enhancing operational efficiency and providing greater value to their stakeholders by better aligning with the dynamics of the Portuguese energy market and increasing operational efficiency.
In addition to managing these assets with proven reliability and performance, ENGIE also has other hybridization projects with solar to continue producing electricity safely and efficiently, with respect for the environment and at a competitive price.

FAFE  WIND FARM
The Terras Altas de Fafe Wind Farm, with a total installed capacity of 128.5 MW, is located in Varzeacova, in the municipalities of Fafe and Celorico de Basto, Braga district. It was developed in three phases: the first 80 MW in 2004/2005, an extension of 26 MW in 2008, and an additional 22.5 MW in 2023. It consists of 53 Gamesa G87 wind turbines and 5 Vestas V150 wind turbines, having started operation in December 2004.
The average annual production is approximately equivalent to the electricity consumption of Fafe, Celorico de Basto, and Cabeceiras de Basto.

COORDINATES: 41.508192; -8.091903
TECHNICAL INFORMATION
START OF COMMERCIAL OPERATION: 2004 / 2008 / 2023
INSTALLED CAPACITY: 128.5 MW
NUMBER OF WIND TURBINES: 53 Gamesa G87 wind turbines + 5 Vestas V150 wind turbines

NAVE WIND FARM
The Nave Wind Farm, with an installed capacity of 47 MW, is located in Vila Cova à Coelheira, in the municipalities of Vila Nova de Paiva, Castro Daire, and Moimenta da Beira, Viseu district. It consists of 19 Gamesa G87 wind turbines and 2 Vestas V150 wind turbines, having started commercial operation in January 2007.
The average annual production is approximately equivalent to the electricity consumption of Vila Nova de Paiva, Castro Daire, and Moimenta da Beira.

COORDINATES: 40.934294; -7.781485
TECHNICAL INFORMATION
START OF COMMERCIAL OPERATION: 2007
INSTALLED CAPACITY: 47 MW
NUMBER OF WIND TURBINES: 19 Gamesa G87 wind turbines + 2 Vestas V150 wind turbines

MOURISCA  WIND FARM
The Mourisca Wind Farm, with an installed capacity of 47 MW, is located in Serra da Almofala, in the municipality of Castro Daire, Viseu district. It consists of 19 Gamesa G87 wind turbines and 2 Vestas V150 wind turbines, having started commercial operation in January 2007.
The average annual production is approximately equivalent to the electricity consumption of Castro Daire and São Pedro do Sul.

COORDINATES: 40.934222; -7.781321
TECHNICAL INFORMATION
START OF COMMERCIAL OPERATION: 2007 / 2023
INSTALLED CAPACITY: 47 MW
NUMBER OF WIND TURBINES: 19 Gamesa G87 wind turbines and 2 Vestas V150 wind turbines

RALO WIND FARM 
The Serra do Ralo Wind Farm, with an installed capacity of 41 MW, is located in Vide-Entre-Vinhas, in the municipality of Celorico da Beira, Guarda district. It consists of 16 Gamesa G87 wind turbines and 2 Vestas V150 wind turbines, having started production in June 2006.
The average annual production is approximately equivalent to the electricity consumption of Celorico da Beira, Trancoso, Fornos de Algodres, and Gouveia.

COORDINATES: 40.594077; -7.390366
TECHNICAL INFORMATION
START OF COMMERCIAL OPERATION: 2006 / 2024
INSTALLED CAPACITY: 41 MW
NUMBER OF WIND TURBINES: 16 Gamesa G87 wind turbines and 2 Vestas V150 wind turbines

PRADOS-LOMBA WIND FARM
The Prados-Lomba Wind Farm is located in the municipalities of Guarda and Celorico da Beira, in the Guarda district, and began full commercial operation in 2013. With a capacity of 39.1 MW, this wind farm consists of 17 ENERCON E-92 wind turbines, each with a capacity of 2.3 MW.

TECHNICAL INFORMATION
START OF COMMERCIAL OPERATION: 2013
INSTALLED CAPACITY: 39.1 MW
NUMBER OF WIND TURBINES: 17 (2.3 MW each)
MODEL / MANUFACTURER: E-92 / ENERCON

 

Flex Gen & Retail

The maintenance of these assets in our portfolio stems from the strategic split of TrustEnergy, announced in August 2024, which represented an important step in ENGIE’s growth and national consolidation as a world-leading brand in the Net Zero Carbon energy transition.
TrustEnergy was a joint venture between ENGIE (50%) and Marubeni (50%), with a strong presence in the energy sector in Portugal. The split was designed to boost focus and accelerate growth for both shareholders. With this split, both companies sought to concentrate on their core competencies, enhancing operational efficiency and providing greater value to their stakeholders by better aligning with the dynamics of the Portuguese energy market and increasing operational efficiency.



Tejo Energia is a joint venture between Engie (56.25%) and Endesa Generación (43.75%). It owns the Pego Electricity Production Center, where the former Coal Power Plant is located.

Certification ISO 45001

Certification ISO 14001

Environmental Policy

CONTACT:
Quinta da Fonte
Edifício Q52, D. João I
Piso 0/A
2770-203 Paço de Arcos
T. +351 214 403 211


Elecgás is a joint venture between Engie and Endesa Generación, with equal stake of 50% each. It is the company that owns the Pego Combined Cycle Power Plant, established to own, build, and operate this asset, located in Abrantes, and produces electricity using natural gas.
It has a maintenance and operation contract with Pegop, through which it has the following certifications:

Certification ISO 45001

Certification ISO 14001

Environmental Policy

CONTACT:
Centro de Produção de Electricidade do Pego
Estrada Nacional 118 km 142.1
2205-380 Pego
Abrantes
T. +351 241 240 001
E. geral@elecgas.pt
Learn more about Elecgas here: http://www.elecgas.pt/


Pegop, SA is a joint venture between Engie and Endesa Generación, with an equal stake of 50% each, responsible for the daily operation and maintenance of the Pego Combined Cycle Power Plant. The accumulated experience in the areas of Production, Engineering, and Human Resources ensures the plant operates with excellence. All activities at the plant are carried out adhering to the highest safety standards. This is one of Pegop’s main priorities and an area where it has won numerous international awards. It is also certified in the areas of environmental management systems, occupational health, and safety.

Certification ISO 45001

Certification ISO 14001

Environmental Policy

CONTACT:
Centro de Produção de Electricidade do Pego
Estrada Nacional 118, km 142.1
2205-380 Pego – Abrantes
T. +351 241 830 500
E. geral@pegop.com